Figure 5: Steel pipes loaded with a gap in front of the load and with inadequate tie-down lashing. Load securing would have been sufficient if friction-enhancing mats had been used. The upper layer of steel pipes was loaded in the cantline, so increasing the lateral pressure on the lower pipes. As a result, more load securing is necessary.
Figure 5: Steel pipes loaded with a gap in front of the load and with inadequate tie-down lashing. Load securing would have been sufficient if friction-enhancing mats had been used. The upper layer of steel pipes was loaded in the cantline, so increasing the lateral pressure on the lower pipes. As a result, more load securing is necessary.